INFRASTRUCTURE & FACILITIES
 
WORK SHOP
Open land of about 5800 sq m. for fabrication works.
 
 
COVERED SHED

Covered  shed of 2000 sq .m.

 

 

HEAT TREATMENT PLANT

Heat treatment plant (6m x 2m x 4m) 10 tons product  say bogie frame. Heating capacity up to 1400º c and having Stress relieving Equipment connected.
 
 
PLANT & MACHINERY
12–T  cranes – 03 Nos. 
Air compressors  (7  kgs / cm² ) – 03 Nos.
Welding Rectifiers – 47 Nos.
Tractor trailer   (12 – T ) – 01 No.
Backup power generator (150 kva) – 1 No.
MIG  /  MAG  automatic M/C – 04 Nos.
MMAW/MIG/MAG,M/C
 
METHOD OF CONSTRUCTION
Study of basic drawings.   
Preparation of working drawings & approvals
Procurement of materials.
Mobilization of resources for execution on two
tracks, at two sites Simultaneously
Site survey and marking the existing levels.
All  safety  and  fire precautions as per guide lines will be followed.

 

REMOVAL OF OLD TRACK
One  team  works  for  removal  of  old track and concurrently one more team fabricate base plates, sole plates & rails.
 
 
CORE CUTTING MACHINE
Drilling of holes with diamond core cutting machine.
 
Installation  of  pre-fabricated  base   &  sole plates and also Rails.
Grouting with Fosroc  GP2 mix under the base plates.
Pouring of PCC around Rails.
Checking Rail top levels and inspection.
Installation of safe load indicating system.
3rd party (IRS) inspection for load test and certification.
Handing over to users.
   
HUMAN RESOURCE
Experienced Project team  :- 
Project Manager.
Supervisors.
Quality inspectors.
Qualified technicians.
Mechanics.
Fitters.
Plumbers.
Cutters  &  Markers.
Welders  (4G & 6G & others).
Electricians.
Helpers.